29/07/2019 - Bannerdale Infrastructure Project ref: 2374    Recommendations Approved

Decision Maker: Head of Commercial Business Development

Decision published: 09/09/2019

Effective from: 29/07/2019

Decision:

(i) The combined tender value of £58,326 from Awards K Barrier, Avanti Steel, EC Surfacing and Pushkin Signs Ltd is accepted; and

 

(ii) letters of acceptance are issued accordingly.

Lead officer: Tim Hardie


29/07/2019 - Burngreave Public Health Improvements (Phase 1b) ref: 2373    Recommendations Approved

Decision Maker: Head of Commercial Business Development

Decision published: 09/09/2019

Effective from: 29/07/2019

Decision:

(i) The combined tender value of £39,104 from SCC Playground team, Sutcliffe Play, Play and Leisure, MHH Contracting and ACME Tree Care is accepted, and

 

(ii) letters of acceptance are issued accordingly.

Lead officer: Tim Hardie


29/07/2019 - Colley Park Improvements and Play ref: 2372    Recommendations Approved

Decision Maker: Head of Commercial Business Development

Decision published: 09/09/2019

Effective from: 29/07/2019

Decision:

(i) The tender of Timberplay Ltd in the sum of £209,032.68 is accepted; and

 

(ii) a Letter of Acceptance is issued accordingly.

Lead officer: Tim Hardie


29/07/2019 - Dobcroft Infant & Dobcroft Junior Mobile Replacements ref: 2375    Recommendations Approved

Decision Maker: Head of Commercial Business Development

Decision published: 09/09/2019

Effective from: 29/07/2019

Decision:

(i) The tender of Lewis Ashley Services Ltd in the sum of £150,820 is accepted;

 

(ii) a letter of acceptance is issued accordingly; and

 

(iii) a contract variation is instructed for the mobile replacement at Dobcroft Junior School.

Lead officer: Tim Hardie


29/07/2019 - Shooters Grove Accessibility (Phase 1) ref: 2376    Recommendations Approved

Decision Maker: Head of Commercial Business Development

Decision published: 09/09/2019

Effective from: 29/07/2019

Decision:

(i) The tender of William Birch & Sons Ltd. in the sum of £108,854.07 is accepted, and

 

(ii) A letter of acceptance is issued accordingly.

Lead officer: Tim Hardie


15/07/2019 - Approval to Accept Grant Funding from Controlling Migration Fund for the 'Welcome to Sheffield' project ref: 2350    Recommendations Approved

For approval to accept grant funding of £198,620 from the Controlled Migration Fund (CMF) through the Ministry of Housing, Communities and Local Government (MHCLG).

 

These funds will be used on the Council’s ‘Welcome to Sheffield’ project. This project develops and delivers English Language development strategies that will enable and support adults and families to Integrate within the Northeast and East communities of Sheffield.

 

Decision Maker: Executive Director, People Services

Decision published: 25/07/2019

Effective from: 15/07/2019

Decision:

It is recommended that the Interim Executive Director People Services:

 

  1. Approves acceptance of the grant funding in the sum of £198,620 from the Ministry of Housing, Communities and Local Government for the year 2019/ 2020.

 

Lead officer: Emma Beal


23/07/2019 - Portfolio Surplus Land Declaration: <br/>Site of the former Hemsworth School, Blackstock Road, S14 1AA<br/> ref: 2349    Recommendations Approved

The report seeks agreement for the site of the former Hemsworth School, Blackstock Road, S14 1AA to be declared surplus as it is no longer required by the portfolio for the delivery of services.

 

Decision Maker: Executive Director, People Services

Decision published: 24/07/2019

Effective from: 23/07/2019

Decision:

That the site of the former Hemsworth School, Blackstock Road, S14 1AA shown at Appendix A of the report, be declared surplus to the requirements of the People Services portfolio.

 

Lead officer: Tricia Slater


16/07/2019 - Authorisation to enter into delivery contracts, accept cash match from partners and make payment of grants to SMEs in furtherance of delivering the RISE Enhancement Project ref: 2348    Recommendations Approved

Having received approval in April 2019 to enter into a funding agreement with MHCLG for the delivery of the RISE Enhancement Project, the Council is now in a position to begin contracting with partners (those who have provided match funding and those we intend to commission to deliver services).  Having these grant agreements in place will provide a framework for accepting grant funding from each institution. 

 

Decision Maker: Director of City Growth

Decision published: 24/07/2019

Effective from: 16/07/2019

Decision:

That the Director (City Growth) authorises Sheffield City Council to:

  • Enter into delivery partner agreements with the Universities to deliver their element of project activity.
  • Accept a cash match contribution from the University of Sheffield (£248,353) and Sheffield Hallam University (£247,173) towards project delivery costs.
  • Enter into a contract with the successful bidder following an OJEU procurement process to appoint a Delivery Partner.
  • Run a grant programme where grants of up to £2,500 are issued to SMEs across the SCR once they employ a graduate.

 

Lead officer: Diana Buckley, Sarah Lowijones


17/07/2019 - Developing The Sheffield Street Tree Strategy ref: 2339    Recommendations Approved

The report will seek Cabinet approval to begin the process of developing a new Street Tree Strategy and provide an update on progress following the street trees joint position statement.

Decision Maker: Co-operative Executive

Made at meeting: 17/07/2019 - Co-operative Executive

Decision published: 23/07/2019

Effective from: 30/07/2019

Decision:

8.1

The Executive Director, Place, submitted a report updating Cabinet on the steps taken since the Council issued the Street Trees Joint Position Statement and adopted the Sheffield Trees and Woodlands Strategy in December 2018 and to seek endorsement for the proposed process and timescales for developing a new Street Tree Strategy.

 

 

8.2

RESOLVED: That Cabinet:- 

 

 

 

(a)

notes and endorses the positive progress made following the issue of the Street Trees Joint Position Statement and the adoption of the Sheffield Trees and Woodlands Strategy in December 2018 including:

 

·         the establishment of the Street Tree Strategy development group, including the appointment of Liz Ballard as its chair; and

·         the adoption of the new joint inspection and assessment process for street trees.

 

 

 

 

(b)

agrees to receive a draft of the Street Tree Strategy for consideration in January 2020; and

 

 

 

 

(c)

notes the recommendations made by Amey to the Council in respect of the trees assessed to date as part of the new process, and advocates the continuation of this approach for future tranches.

 

 

 

8.3

Reasons for Decision

 

 

8.3.1

It is considered that the approach set out in the report will enable the Council to make good on the commitments it has made in the Joint Position Statement and the Trees and Woodlands Strategy.  It is also felt that the approach being taken by Amey that Cabinet are being asked to advocate continues to represent an acceptable balance between the benefits of mature street trees and the need to maintain the highway programme for the benefit of all Sheffield communities without additional expenditure on the part of the Council.

 

 

8.4

Alternatives Considered and Rejected

 

 

8.4.1

The only other options that are open to Cabinet are to reject the outcomes of the new approach and to revert to the previously agreed policy for the street tree element of the Streets Ahead programme.  It is considered that this would not be in line with the commitments set out in the Joint Position Statement agreed with  Sheffield Tree Action Groups (STAG) members, and would be likely to result in substantial loss of trust for the Authority, as well as placing the successful completion of the Streets Ahead programme in significant doubt.

 

 

8.4.2

Similarly, Cabinet could decide not to endorse the approach to the development of the Street Tree Strategy and to rely on the existing Five Year Tree Management Strategy (produced by Amey) and the Council’s current Highway Tree Replacement Policy.  This would also be out of line with the commitments set out in the Joint Position Statement and the Trees and Woodlands Strategy agreed by Cabinet in December 2018.

 

 

8.5

Any Interest Declared or Dispensation Granted

 

 

 

None

 

 

8.6

Reason for Exemption if Public/Press Excluded During Consideration

 

 

 

None

 

 

8.7

Respective Director Responsible for Implementation

 

 

 

Laraine Manley, Executive Director, Place.

 

 

8.8

Relevant Scrutiny and Policy Development Committee If Decision Called In

 

 

 

Economic and Environmental Wellbeing.

 

Lead officer: James Henderson


17/07/2019 - Sheffield Olympic Legacy Park ref: 2341    Recommendations Approved

To provide an update on the future direction of Sheffield Olympic Legacy Park, including future governance arrangements, role of wider stakeholders, funding, and options for a private sector development partner.

Decision Maker: Co-operative Executive

Made at meeting: 17/07/2019 - Co-operative Executive

Decision published: 23/07/2019

Effective from: 30/07/2019

Decision:

10.1

The Executive Director, Place, submitted a report providing an update on the future direction of the Sheffield Olympic Legacy Park (SOLP), including future governance arrangements, role of wider stakeholders, funding, and options for a private sector development partner. An appendix showing a Plan for the Park was also circulated to Members at the meeting.

 

 

10.2

RESOLVED: That Cabinet;

 

 

 

(a)       notes the progress made at Sheffield Olympic Legacy Park (SOLP) to date;

 

 

 

(b)       confirms the expanded vision and geographical reach of an extended SOLP, as set out in the report and at Appendix 1 now circulated at this meeting;

 

 

 

(c)        approves the retainment of Legacy Park Limited (LPL) as the special purpose vehicle charged with driving forward delivery of SOLP on the basis and implications as set out in this report;

 

 

 

(d)       confirms the role and remit of LPL as set out in the report, including reporting arrangements;

 

 

 

(e)       approves up to £150,000 per annum for 3 years from the Council’s Corporate Investment Fund to cover underwriting risk in support of operations associated with SOLP;

 

 

 

(f)        in respect of the current financial year, approves the underwriting of up to £150k of current operating costs but work with LPL to move to a capped contribution of £80k by December;

 

 

 

(g)       approves the principle of a Memorandum of Understanding, as set out at section 2 of the report, designed to oversee the relationship between Sheffield City Council and LPL;

 

 

 

(h)       approves the negotiation with Scarborough International Property Limited as preferred development partner in order to drive forward the commercial development of SOLP, working in conjunction with Sheffield City Council and wider SOLP partners, with terms to be agreed by the Executive Director, Place in consultation with the Cabinet Member for Finance, Resources and Governance, Cabinet Member for Business and Investment, and Director of Legal and Governance; and

 

 

 

(i)         commissions LPL and City Council officers to produce annual reports on the impact of SOLP.

 

 

10.3

Reasons for Decision

 

 

10.3.1

In order to continue and expand the economic and social benefits to the city, it is recommended to confirm an expanded vision for SOLP, including retaining the special purpose vehicle LPL.

 

 

10.3.2

In order to ensure strong governance and democratic accountability, it is recommended that a Memorandum of Understanding is put in place to oversee the relationship between SCC and LPL.

 

 

10.3.3

In order to accelerate the commercial development of SOLP, it is recommended the Council negotiates with Scarborough International Property Limited as preferred development partner.

 

 

10.4

Alternatives Considered and Rejected

 

 

10.4.1

The main broad alternative options for the strategic direction of SOLP are as follows:-

 

 

 

Option

Analysis

 

SCC to withdraw from LPL and cease its involvement in SOLP

This would jeopardise SOLP’s success to date and represent a major loss to the city’s economic fortunes. As SOLP is on Council land, this is not only not a viable option, it would also damage the Council commercially and its reputation.

 

 

Not extend SOLP and cap the project at is current geographic extent.

As set out in this report, there is the opportunity and appetite from partners and to expand the impact of SOLP by increasing its size and reach.

 

 

End LPL as a stand-alone company and deliver SOLP in-house.

As set out in this report, this would not generate a significant saving to the Council as dedicated delivery capacity would still be needed, but it would risk a significant loss of momentum and effectiveness. On the understanding that the LPL will involve other partners, this report recommends continuing with LPL.

 

 

Transfer land and assets to LPL

This would mean SCC lose control of the decision making process. As set out in this report, it is essential that the Council seeks to recoup as much of the investment made to date in OLP as possible. LPL acting as the single point of contact for investment enquiries, but SCC retaining control of assets is felt to be the best way of achieving this.

 

It is unlikely to meet the legal requirements for achieving best consideration.

 

 

Pursue SOLP without an expanded set of partners

SOLP is a partnership of public and private sector bodies. No one institution could deliver the research and development, land, commercial and community elements of SOLP alone.

 

 

Do not appoint a private sector development partner

Would mean either no further expansion was likely or that the public sector would bear the up front development costs and risks.

 

 

Procure private sector development partner

Would mean lengthy process, delaying future development and potentially losing the only developer who has shown interest in developing SOLP future phases.

 

Would provide a competitive process if there were more bidders and allow the Council to have more control over development.

 

 

 

10.5

Any Interest Declared or Dispensation Granted

 

 

 

None

 

 

10.6

Reason for Exemption if Public/Press Excluded During Consideration

 

 

 

None

 

 

10.7

Respective Director Responsible for Implementation

 

 

 

Laraine Manley, Executive Director, Place.

 

 

10.8

Relevant Scrutiny and Policy Development Committee If Decision Called In

 

 

 

Economic and Environmental Wellbeing.

 

 

 

 

Lead officer: Edward Highfield


17/07/2019 - Young People's Substance Misuse Service ref: 2340    Recommendations Approved

Needs analysis to retender the contract to provide harm reduction advice and intervention to young people affected by substance misuse.

 

Decision Maker: Co-operative Executive

Made at meeting: 17/07/2019 - Co-operative Executive

Decision published: 23/07/2019

Effective from: 30/07/2019

Decision:

9.1

The Interim Executive Director, People Services, submitted a report setting out the proposed approach to recommissioning drug and alcohol treatment and support services for children and young people aged 10 to 18 in Sheffield separate to, and alongside, the adult treatment service as part of an all age approach.  The current contract ends on 31st March 2020 and falls within the Council’s public health duties.

 

 

9.2

RESOLVED: That Cabinet:- 

 

 

 

(a)

approves the proposal to recommission young people’s substance misuse services as set out in the report, to secure services for the support and treatment for the children and young people of Sheffield with substance use needs; and

 

 

 

 

(b)

delegates authority to the Director of Commissioning, Learning and Inclusion, in consultation with the Director of Finance and Commercial Services and the Cabinet Member for Children and Families, to agree the final procurement strategy and approve a contract award following the tender process.

 

 

 

9.3

Reasons for Decision

 

 

9.3.1

Good quality drug and alcohol support services are essential to help individuals turn their lives around and build stronger families and communities in Sheffield.

 

 

9.3.2

The Council has a duty to provide drug and alcohol treatment and support services for the people of Sheffield.  The Council is not best placed to deliver these required services, so recommissioning is recommended.

 

 

9.3.3

The current legal contractual arrangements in place for  both adult and young people services expire on 31 March 2020.This process will ensure continuity of aligned services, with improved access and transitions, to deliver against the Drug Strategy 2018-2022. 

 

 

9.3.4

The service will be based on local need and trend analysis, and performance data for current service provision will inform where change and improvement is needed for the forthcoming contract period.

 

 

9.4

Alternatives Considered and Rejected

 

 

9.4.1

The Young People Substance Misuse Service has been provided by the Council for 15 years and is a key plank of the local Drug Strategy.  The current contract cannot be extended and the opportunity is to recommission the service in line with the adult substance misuse service as part of an all age approach.

 

 

9.4.2

Another option would be for the Council to deliver the service in house; this has been rejected for a number of reasons.  Firstly, the service model involves a significant element of clinical expertise.  Secondly, the Council has no experience of delivering the service, and there is a well-developed market of qualified and experienced potential providers.  Finally, the Council has no systems in place for clinical supervision of a workforce, licences to hold medication, or provision to manage safe prescribing, and the cost of making the necessary arrangements would be disproportionately high and poor value for money when existing, fit for purpose options exist in the market.

 

 

9.5

Any Interest Declared or Dispensation Granted

 

 

 

None

 

 

9.6

Reason for Exemption if Public/Press Excluded During Consideration

 

 

 

None

 

 

9.7

Respective Director Responsible for Implementation

 

 

 

John Doyle, Interim Executive Director, People Services.

 

 

9.8

Relevant Scrutiny and Policy Development Committee If Decision Called In

 

 

 

Healthier Communities and Adult Social Care.

 

Lead officer: Carol Fordham


17/07/2019 - Disposal of Lease for Parkwood Springs Leisure Destination ref: 2344    Recommendations Approved

To gain approval for the terms of lease which the Council proposes to dispose of for the redevelopment of the former Parkwood Springs ski village.

Decision Maker: Co-operative Executive

Made at meeting: 17/07/2019 - Co-operative Executive

Decision published: 23/07/2019

Effective from: 30/07/2019

Decision:

13.1

The Executive Director, Place, submitted a report seeking authority to enter into an agreement for lease with Extreme Destinations Limited for Sheffield City Council’s land interests at the former Parkwood Springs Ski Village and adjoining land, to enable redevelopment of this prominent and derelict site as an outdoor leisure destination.

 

 

13.2

RESOLVED: That Cabinet:- 

 

 

 

(a)

delegates authority to the Chief Property Officer, in consultation with the Executive Director, Resources, to agree terms for the disposal of the land, including any reasonable variations, to the boundaries as required, and authorises the Director of Legal and Governance to complete all necessary legal documentation and notices in order to complete the disposal, subject to no objections being received to the open space notice; and

 

 

 

 

(b)

declares the hatched land, as outlined in Appendix C of the report, surplus to requirements.

 

 

13.3

Reasons for Decision

 

 

13.3.1

Preferred option – Proceed with the AfL with Extreme Leisure Destinations

 

 

 

This approach passes the commercial and financial risk of the development and design work to the developer.  Safeguards are built into the Agreement for Lease to commit the developer to timely delivery and ensure the Council retains control should the developer fail to make significant progress.

 

 

13.3.2

Entering into the AfL with Extreme Leisure Destinations will enable detailed work to begin on development of the scheme whilst protecting the Council’s interests.  This represents an important step in realising the vision set out in the Parkwood Masterplan and achieving the benefits for local communities and the people of Sheffield.  The AfL enables SCC to pass commercial risk to the developer through a traditional landowner-developer relationship, with principal risks managed by Extreme.

 

 

13.4

Alternatives Considered and Rejected

 

 

13.4.1

Do nothing – Council retain site

·           Nil impact on Council’s resource capacity to deliver redevelopment.

·           Fails to deliver on the Council’s Outdoor City Economic Strategy.

·           Leaves a prominent strategic site derelict and unviable for redevelopment by the market, whilst at the same time vulnerable to continued anti-social behaviour, vandalism and arson, with an ongoing maintenance cost and liability to the Council in the long term.

·           Does not assist the Council any further to market the site anew if current development partnership was not successful.

 

 

13.4.2

Council carries out improvement/infrastructure works and then re-markets the site

·           The Council could seek to enhance the value of the land and deliverability/viability by carrying out improvement/infrastructure works prior to release/disposal (such as works to the access road and improvements to drainage) before re-marketing the site.

·           There is no certainty of securing a developer to deliver the economic aspirations and outcomes expected from the site or guarantee that a significantly improved market rate will be achieved.

 

 

13.4.3

Council retains the site and undertakes the development itself

·           The Council could develop, and operate or seek an operator for a leisure destination.

·           This approach would require significant resource and funding and, as set out in the report, the viability and risk associated with developments of this nature can be marginal.

·           At this point in time this approach would expose the Council to undue commercial and financial risk.

 

 

13.5

Any Interest Declared or Dispensation Granted

 

 

 

None

 

 

13.6

Reason for Exemption if Public/Press Excluded During Consideration

 

 

 

None

 

 

13.7

Respective Director Responsible for Implementation

 

 

 

Laraine Manley, Executive Director, Place

 

 

13.8

Relevant Scrutiny and Policy Development Committee If Decision Called In

 

 

 

Economic and Environmental Wellbeing

 

 

Lead officer: Tammy Whitaker


17/07/2019 - Month 2 Capital Approvals ref: 2342    Recommendations Approved

This report provides details of the additions and variations to the Capital Programme for approval by Cabinet.

Decision Maker: Co-operative Executive

Made at meeting: 17/07/2019 - Co-operative Executive

Decision published: 23/07/2019

Effective from: 30/07/2019

Decision:

11.1

The Executive Director, Resources, submitted a report providing details of proposed changes to the Capital Programme, as brought forward in Month 2 2019/20.

 

 

11.2

RESOLVED: That Cabinet:-

 

 

 

(a)

approves the proposed additions and variations to the Capital Programme listed in Appendix 1 of the report, including the procurement strategies and delegates authority to the Director of Finance and Commercial Services or nominated Officer, as appropriate, to award the necessary contracts;

 

 

 

(b)

approves the acceptance of accountable body status of the grant funding detailed at Appendix 2 of the report; and

 

 

 

(c)

approves the making of grants to third parties as detailed at Appendix 2a of the report.

 

 

11.3

Reasons for Decision

 

 

11.3.1

The proposed changes to the Capital Programme will improve the services to the people of Sheffield.

 

 

11.3.2

To formally record changes to the Capital Programme and gain Member approval for changes in line with Financial Regulations and to reset the Capital Programme in line with latest information.

 

 

11.3.3

Obtain the relevant delegations to allow projects to proceed.

 

 

11.4

Alternatives Considered and Rejected

 

 

11.4.1

A number of alternative courses of action are considered as part of the process undertaken by Officers before decisions are recommended to Members. The recommendations made to Members represent what Officers believe to be the best options available to the Council, in line with Council priorities, given the constraints on funding and the use to which funding is put within the Revenue Budget and the Capital Programme.

 

 

11.5

Any Interest Declared or Dispensation Granted

 

 

 

None

 

 

11.6

Reason for Exemption if Public/Press Excluded During Consideration

 

 

 

None

 

 

11.7

Respective Director Responsible for Implementation

 

 

 

Eugene Walker, Executive Director, Resources.

 

 

11.8

Relevant Scrutiny and Policy Development Committee If Decision Called In

 

 

 

Overview and Scrutiny Management Committee.

 

 

 

Lead officer: Damian Watkinson


17/07/2019 - Revenue Budget and Capital Programme Monitoring 2019/20 - as at 31 May 2019 ref: 2343    Recommendations Approved

This report provides the Month 3 monitoring statement on the City Council’s Revenue Budget and Capital Programme for 2019/20

Decision Maker: Co-operative Executive

Made at meeting: 17/07/2019 - Co-operative Executive

Decision published: 23/07/2019

Effective from: 30/07/2019

Decision:

12.1

The Executive Director, Resources, submitted a report providing the outturn monitoring statement on the City Council’s Revenue Budget and Capital Programme as at the end of Month 2, 2019/20.

 

 

12.2

RESOLVED: That Cabinet:- 

 

 

 

(a)

notes the updated information and management actions provided by the report and the attached appendix on the 2019/20 Revenue Budget Outturn; and

 

 

 

 

(b)

in relation to the Capital Programme, notes the forecast outturn position, as outlined in Appendix 2 of the report.

 

 

12.3

Reasons for Decision

 

 

12.3.1

To record formally changes to the Revenue Budget and the Capital Programme.

 

 

12.4

Alternatives Considered and Rejected

 

 

12.4.1

A number of alternative courses of action are considered as part of the process undertaken by Officers before decisions are recommended to Members. The recommendations made to Members represent what Officers believe to be the best options available to the Council, in line with Council priorities, given the constraints on funding and the use to which funding is put within the Revenue Budget and the Capital Programme.

 

 

12.5

Any Interest Declared or Dispensation Granted

 

 

 

None

 

 

12.6

Reason for Exemption if Public/Press Excluded During Consideration

 

 

 

None

 

 

12.7

Respective Director Responsible for Implementation

 

 

 

Eugene Walker, Executive Director, Resources

 

 

12.8

Relevant Scrutiny and Policy Development Committee If Decision Called In

 

 

 

Overview and Scrutiny Management Committee

 

Lead officer: David Phillips